Evolution Fire
Protection
Orange Hospital
Sector :
Hospital
Principal Contractor:
Hansen Yuncken
Project Value ( Approx ):
$1.2m
Design Consultant:
Triple M Fire
In 2009 Evolution Fire Protection were engaged to install a Fire Detection & EWIS system to Orange Hospital.
These works included the install & construction of the Fire Detection & EWIS system to AS1670 & BCA 2009. Aswell as compartmentised smoke control in accordance with AS 1668
This project consisted of a new 300-bed hospital, 60-bed acute mental health unit and 40-bed secure mental health unit, as well as heritage refurbishment to existing mental health and administration buildings.
The system was supplied by Ampac.