Orange Hospital

Sector : 
Hospital


Principal Contractor: 
Hansen Yuncken


Project Value ( Approx ):

$1.2m

Design Consultant: 
Triple M Fire
 

In 2009 Evolution Fire Protection were engaged to install a Fire Detection & EWIS system to Orange Hospital. 

These works included the install & construction of the Fire Detection & EWIS system to AS1670 & BCA 2009. Aswell as compartmentised smoke control in accordance with AS 1668

 

This project consisted of a new 300-bed hospital, 60-bed acute mental health unit and 40-bed secure mental health unit, as well as heritage refurbishment to existing mental health and administration buildings.

 

The system was supplied by Ampac.